
Kerala Blasters FC hammered Sporting Club Delhi 3‑0 in their second AIFF Super Cup match, sealing the top spot in Group D and sparking excitement in Bambolim. The game took place at the GMC Stadium on Monday afternoon, and all three goals came in the first half.
The Blasters’ attack was on fire from the start. Koldo Obieta opened the scoring early, picking up a loose pass from Ayush Adhikari in the 17th minute and calmly slinging the ball past Vishal Yadav. Five minutes later, Obieta doubled the lead after a quick run and a perfectly timed finish from the left side. In the 34th minute, captain Luna set up Korou Singh Thingujam, who curled a right‑footed header into the far corner, completing the trio of goals.
With the win, Kerala Blasters earned six points from two games and now sit on top of the group. Sporting Club Delhi, meanwhile, is knocked out of the tournament and will look to regroup next season. The Blasters’ strong form gives them a solid chance of reaching the AIFF Super Cup semi‑finals.
Kerala Blasters dominated the match with disciplined defending, creative midfield play, and relentless pressing. They moved the ball with fluidity, kept the pressure high, and stretched Sporting Club Delhi’s backline to force errors. The game was a showcase of disciplined defense, creative midfield, and clinical striking—exactly why fans are excited about their chances.
At the end of the match, Sporting Club Delhi made a brief resurgence in the second half, but their effort in the 88th minute was stopped by goalkeeper Nora Fernandes, preserving the Blasters’ clean sheet. The result leaves Kerala Blasters ready for the next round of the AIFF Super Cup and looking forward to an exciting run in the competition.
Source: ianslive
Stay informed on all the latest news, real-time breaking news updates, and follow all the important headlines in world News on Latest NewsX. Follow us on social media Facebook, Twitter(X), Gettr and subscribe our Youtube Channel.















